Opens in a new tab

Case study

URBAN: a crisis job that ended with an award

I want a stand like this
Client
URBAN
Industry
Industry / machinery
Fairs / cities
300 m² stand with a large machine
Build type
Custom, rigged structure
Length of cooperation
One-off project

About the project

A crisis change that ended with an award

stand photo
Stoisko targowe URBAN
Problem
14 days before assembly, the client changed the model of the large machine shown on a 300 m² stand. The new exhibit clashed with the planned rigging points and made the approved design impossible to build.
Solution
AMAKO EXPO urgently redesigned the rigging structure, agreed the changes with the organiser, and coordinated the stand assembly with the transport and placement of the machine. A dedicated project manager oversaw the whole job.
Result
The stand was finished and passed its technical inspection on time, with no issues. Despite the last-minute change, the project won the award for best stand, which confirms AMAKO EXPO's flexibility and operational strength.

Why we work this way at Amako

  • A response in 14 daysA full redesign of the rigging, agreed with the organiser.
  • A dedicated project managerOne person overseeing the build, the transport, and the machine.
  • Award for best standHanded over on time and with no defects, despite the change.

More photos of the stand

Stoisko targowe URBAN, zdjęcie 1Stoisko targowe URBAN, zdjęcie 2Stoisko targowe URBAN, zdjęcie 3Stoisko targowe URBAN, zdjęcie 4

The URBAN project proves that a crisis change does not have to cost you the deadline or the quality of the build.

Shall we start?

Your case could be next

Tell us about your challenge. We will show you how we would solve it with a stand, and prepare a free 3D design.